Aerospace Projects
MET-CON, Inc. |
| |
Project:
Boeing Evolved Expendable Launch Vehicle
Mobile Service Tower
|
 |
 |
| Owner: The Boeing
Company
Architect: Raytheon Engineers and
Constructors, Inc.
Contractor: Raytheon Constructors, Inc.
Contract Amount: $26,155,737
Completion Date: June 2002
Description: Construction of a new
Mobile Service Tower for the Boeing Company's Evolved Expendable Launch
Vehicle. Project is being constructed as a fast track project while the
vehicle is under design. Work includes structural steel (approximately 4,000
tons), composite metal siding, fireproofing and coatings. |
| |
| Project:
Evolved Expendable Launch Vehicle Fixed Umbilical Tower
Owner: The Boeing Company
Architect: Raytheon Engineers and
Constructors, Inc.
Contractor: Raytheon Constructors,
Inc.
Contract Amount: $7,893,033.00
Completion Date: June 2002
Description: Construction of a new
Fixed Umbilical Tower for the Boeing Company's Evolved Expendable Launch
Vehicle. Project is being constructed as a fast track project while the
vehicle is under design. Work includes structural steel (approximately 950
tons), composite metal siding and coatings. |
| |
| Project:
Vero Beach Airport Traffic Control Tower
Owner:
The Federal Aviation Administration
Architect:
Radian International LLC
Contractor:
PCL Construction Services, Inc.
Contract Amount:
$261,946
Completion Date:
June 2002
Description: Structural and
miscellaneous steel fabrication and erection of a 100 foot high air traffic
control tower at the Vero Beach Municipal Airport. |
| |
Project:
Replace Z Rails at Space Launch Complex 40
(SLC-40), Cape Canaveral Air Station, Florida
|
|
 |
| Contractor: Sunshine
Construction and Engineering, Inc.
Engineer: AJT & Associates, Inc.
Description: Under this subcontract,
Met-Con was tasked to remove and replace the support rails for the Mobile
Service Tower at SLC-40. Duties included surveying the existing rails,
demolishing them, setting the new anchor bolts, securing them against
movement while foundations were poured, placing the leveling plates, and
laying out and setting the new rails, all to a tolerance of three decimal
places. A unique system of leveling bolts was installed to give the client
the flexibility of later raising the leveling plates to compensate for
anticipated settling of the rails. The work was accomplished using multiple
shifts working 24 hours a day, 7 days a week. The project was completed
ahead of schedule and in less than 60 days, resulting in early completion
bonuses for both Sunshine and Met-Con. |
| |
| Project:
Movable Platforms, Centaur Processing
Facility, Cape Canaveral Air Station, Florida
Contractor: David Boland, Inc.
Engineer: Reynolds, Smith & Hills, Inc.
Description: Under this subcontract,
Met-Con was responsible for the detailing, machining, fabrication, erection,
testing, and checkout of all fixed and movable platforms in this new $30M
facility designed to support the processing of the Atlas-Centaur launch
vehicle. |
| |
| Project:
White Room Extensions at Space Launch
Complexes (SLCs) 17A & B, Cape Canaveral Air Station, FL
Contractor: Butler Construction
Company, Inc.
Engineer: Briel, Rhame, Poynter &
Houser, Inc.
Description: As principal subcontractor
(85 percent of contract value) for the project, Met-Con was responsible for
structurally reinforcing the existing Mobile Service Tower and Fixed
Umbilical Tower on both complexes; removing the existing sliding roofs and
hammerhead cranes; extending the existing white rooms vertically by 20 feet,
including all doors with pneumatic seals and hydraulic operators; and
reinstalling the original sliding roofs and cranes. |
| |
|